Friday, March 1, 2024. Day 3

Homeroom

COmmunity Service

Collect Service to date.

Opportunities

  • Friday March 8th  basketball tournament need help with the refreshments . 6:00 to 8:00 

  • Friday March 15th - March 29th dodgeball tournament need help with refreshments  5:30 to 7:30

  • Saturday March 23rd Easter event  10:30 to 12:30 

  • 2-4 student each. See me.

Flag: half staff today

  • Friday, February 23, 2024, until sunset on Friday, March 1, 2024, the date of interment, in honor of Staff Sergeant Carlos Dickey, United States Army, Tanker, 3rd Battalion, 67th Armored Regiment, formerly of Lowell, Massachusetts, who passed away on February 13, 2024.

Classwork Due:

  • Spanish:

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Homework:

Today’s Agenda:

YETI Green Project Testing

Test Protocol:

  1. Get cup

  2. Go to assigned lab station

  3. Prepare a stopwatch.

  4. Set up the thermometer 3 cm from bottom of your cup.

    • Use the blue dot side of eraser as a setup block

    • Do no harm to erasers!

  5. Fill styrofoam cup to 300 mL mark.

    • Styrofoam cups are marked inside with a single blue line.

    • This marks 300 mL.

  6. Fill your YETI container with 300 mL of hot water.

    • Pour from the styrofoam cup as soon as you get it.

  7. Lower thermometer to the pre-set depth.

  8. Lower your cover if you have one.

  9. Start stopwatch.

  10. Record temperature every minute for 20 minutes.

Clean Up Protocol

  1. Empty water into a sink.

  2. Return stations to original setup (see below).

  3. Stay at your station and wait for me to dismiss you.

    • Raise hands.

  4. You are scored 5 points for:

    • proper cleanup

    • waiting for dismissal

    • no destruction to the materials at your station

  5. Return to your classroom seat when dismissed.

Thursday, February 29, 2024. Day 2

Homeroom

COmmunity Service

Collect Service to date.

Opportunities

  • Friday March 8th  basketball tournament need help with the refreshments . 6:00 to 8:00 

  • Friday March 15th - March 29th dodgeball tournament need help with refreshments  5:30 to 7:30

  • Saturday March 23rd Easter event  10:30 to 12:30 

  • 2-4 student each. See me.

Flag: half staff today

  • Friday, February 23, 2024, until sunset on Friday, March 1, 2024, the date of interment, in honor of Staff Sergeant Carlos Dickey, United States Army, Tanker, 3rd Battalion, 67th Armored Regiment, formerly of Lowell, Massachusetts, who passed away on February 13, 2024.

Classwork Due:

  • Spanish:

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Take out your chrome book.

go to Google Classroom

Homework:

None

Today’s Agenda:

Yeti Green Materials “Purchase”

  • Complete a “Final Price Worksheet”

  • Submit in GC

    • ONE copy only!

  • All memebrs to see me with this open on a chromebook.

  • Materials allocation

  • Locker Numbers on the submitted assignment.

  • Locker Number neatly and clearly visible on the side of the finished product.

  • Time to build.

Project due Date: all containers to be finished for scoring End of Class on Thursday.

Finalize Portfolios

Organize Contents:

  • these items must be neatly arranged in this order

  1. Rough sketches (any format, neatly stapled together as a group)

  2. Final Sketches (on graph paper, drawn with ruler, well labeled with details and pros/cons)

  3. Design Selection Grid (fulled out filly and final choice identified.

  4. Calculations of Materials Requirements

    • Use FDSS format to calculate the circumference and area of any insulation materials required

  5. Cost Estimate (use the table provided to calculate the cost of the materials you expect to use.)

  6. Cut sheet ( a sketch with dimensions of every material you need to build your container).

  7. Calculation of Volume/Measurement Check

Some may not be done/available - that is OK!

Following this, you may work on your project but there is no access to the supply room.

Identify and List the Materials Needed

Calculate the Mass of Them

Calculate the Price of the materials you need.

YETI Green™ Logo Information

Wednesday, February 28, 2024. Day 1

Homeroom

COmmunity Service

Collect Service to date.

Opportunities

  • Friday March 8th  basketball tournament need help with the refreshments . 6:00 to 8:00 

  • Friday March 15th - March 29th dodgeball tournament need help with refreshments  5:30 to 7:30

  • Saturday March 23rd Easter event  10:30 to 12:30 

  • 2-4 student each. See me.

Flag: half staff today

  • Friday, February 23, 2024, until sunset on Friday, March 1, 2024, the date of interment, in honor of Staff Sergeant Carlos Dickey, United States Army, Tanker, 3rd Battalion, 67th Armored Regiment, formerly of Lowell, Massachusetts, who passed away on February 13, 2024.

A conversation

Stories

Jimmy and Alden

The phone company

COVID

Dunkin Donuts

In school

R

G

Q

F

N

Women

Classwork Due:

  • Spanish:

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Take out your chrome book.

go to Google Classroom

Homework:

None

Today’s Agenda:

Yeti Green Materials “Purchase”

  • Complete a “Final Price Worksheet”

  • Submit in GC

    • ONE copy only!

  • All memebrs to see me with this open on a chromebook.

  • Materials allocation

  • Locker Numbers on the submitted assignment.

  • Locker Number neatly and clearly visible on the side of the finished product.

  • Time to build.

Project due Date: all containers to be finished for scoring End of Class on Thursday.

Finalize Portfolios

Organize Contents:

  • these items must be neatly arranged in this order

  1. Rough sketches (any format, neatly stapled together as a group)

  2. Final Sketches (on graph paper, drawn with ruler, well labeled with details and pros/cons)

  3. Design Selection Grid (fulled out filly and final choice identified.

  4. Calculations of Materials Requirements

    • Use FDSS format to calculate the circumference and area of any insulation materials required

  5. Cost Estimate (use the table provided to calculate the cost of the materials you expect to use.)

  6. Cut sheet ( a sketch with dimensions of every material you need to build your container).

  7. Calculation of Volume/Measurement Check

Some may not be done/available - that is OK!

Following this, you may work on your project but there is no access to the supply room.

Identify and List the Materials Needed

Calculate the Mass of Them

Calculate the Price of the materials you need.

YETI Green™ Logo Information

Tuesday, February 27, 2024. Day 2

Homeroom

Flag: half staff today

  • Friday, February 23, 2024, until sunset on Friday, March 1, 2024, the date of interment, in honor of Staff Sergeant Carlos Dickey, United States Army, Tanker, 3rd Battalion, 67th Armored Regiment, formerly of Lowell, Massachusetts, who passed away on February 13, 2024.

Classwork Due:

  • Spanish:

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Take out your chrome book.

go to Google Classroom

Homework:

None

Today’s Agenda:

Yeti Green Materials “Purchase”

  • Complete a “Final Price Worksheet”

  • Submit in GC

    • ONE copy only!

  • All memebrs to see me with this open on a chromebook.

  • Materials allocation

  • Locker Numbers on the submitted assignment.

  • Locker Number neatly and clearly visible on the side of the finished product.

  • Time to build.

Project due Date: all containers to be finished for scoring End of Class on Thursday.

Finalize Portfolios

Organize Contents:

  • these items must be neatly arranged in this order

  1. Rough sketches (any format, neatly stapled together as a group)

  2. Final Sketches (on graph paper, drawn with ruler, well labeled with details and pros/cons)

  3. Design Selection Grid (fulled out filly and final choice identified.

  4. Calculations of Materials Requirements

    • Use FDSS format to calculate the circumference and area of any insulation materials required

  5. Cost Estimate (use the table provided to calculate the cost of the materials you expect to use.)

  6. Cut sheet ( a sketch with dimensions of every material you need to build your container).

  7. Calculation of Volume/Measurement Check

Some may not be done/available - that is OK!

Following this, you may work on your project but there is no access to the supply room.

Identify and List the Materials Needed

Calculate the Mass of Them

Calculate the Price of the materials you need.

YETI Green™ Logo Information

Monday, February 26, 2024. Day 1

Homeroom

Flag: half staff today

  • Friday, February 23, 2024, until sunset on Friday, March 1, 2024, the date of interment, in honor of Staff Sergeant Carlos Dickey, United States Army, Tanker, 3rd Battalion, 67th Armored Regiment, formerly of Lowell, Massachusetts, who passed away on February 13, 2024.

Classwork Due:

  • Spanish:

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Take out your chrome book.

go to Google Classroom

Homework:

None

Today’s Agenda:

Yeti Green Materials “Purchase”

  • Complete a “Final Price Worksheet”

  • Submit in GC

    • ONE copy only!

  • All memebrs to see me with this open on a chromebook.

  • Materials allocation

  • Locker Numbers on the submitted assignment.

  • Locker Number neatly and clearly visible on the side of the finished product.

  • Time to build.

Project due Date: all containers to be finished for scoring End of Class on Thursday.

Finalize Portfolios

Organize Contents:

  • these items must be neatly arranged in this order

  1. Rough sketches (any format, neatly stapled together as a group)

  2. Final Sketches (on graph paper, drawn with ruler, well labeled with details and pros/cons)

  3. Design Selection Grid (fulled out filly and final choice identified.

  4. Calculations of Materials Requirements

    • Use FDSS format to calculate the circumference and area of any insulation materials required

  5. Cost Estimate (use the table provided to calculate the cost of the materials you expect to use.)

  6. Calculation of Volume/Measurement Check

Some may not be done/available - that is OK!

Following this, you may work on your project but there is no access to the supply room.

Identify and List the Materials Needed

Calculate the Mass of Them

Calculate the Price of the materials you need.

YETI Green™ Logo Information

.

Friday, February 16, 2024. Day 6

Homeroom

Classwork Due:

  • Spanish: Spanish Placement Test Today!

    • Review Graphic Organizer

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Take out your chrome book.

go to Google Classroom

Homework:

None

Today’s Agenda:

Finalize Portfolios

Organize Contents:

  • these items must be neatly arranged in this order

  1. Rough sketches (any format, neatly stapled together as a group)

  2. Final Sketches (on graph paper, drawn with ruler, well labeled with details and pros/cons)

  3. Design Selection Grid (fulled out filly and final choice identified.

  4. Calculations of Materials Requirements

    • Use FDSS format to calculate the circumference and area of any insulation materials required

  5. Cost Estimate (use the table provided to calculate the cost of the materials you expect to use.)

  6. Calculation of Volume/Measurement Check

Some may not be done/available - that is OK!

Following this, you may work on your project but there is no access to the supply room.

Identify and List the Materials Needed

Calculate the Mass of Them

Calculate the Price of the materials you need.

YETI Green™ Logo Information

.

Thursday, February 15, 2024. Day 5

Homeroom

Classwork Due:

  • Spanish: Spanish Placement Test Today!

    • Review Graphic Organizer

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Take out your chrome book.

go to Google Classroom

Homework:

None

Today’s Agenda:

Finalize Portfolios

Organize Contents:

  • these items must be neatly arranged in this order

  1. Rough sketches (any format, neatly stapled together as a group)

  2. Final Sketches (on graph paper, drawn with ruler, well labeled with details and pros/cons)

  3. Design Selection Grid (fulled out filly and final choice identified.

  4. Calculations of Materials Requirements

    • Use FDSS format to calculate the circumference and area of any insulation materials required

  5. Cost Estimate (use the table provided to calculate the cost of the materials you expect to use.)

  6. Calculation of Volume/Measurement Check

Some may not be done/available - that is OK!

Following this, you may work on your project but there is no access to the supply room.

Identify and List the Materials Needed

Calculate the Mass of Them

Calculate the Price of the materials you need.

YETI Green™ Logo Information

.

Wednesday, February 14, 2024. Day 4

Homeroom

Classwork Due:

  • Spanish: Spanish Placement Test Today!

    • Review Graphic Organizer

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Take out your chrome book.

go to Google Classroom

Homework:

None

Today’s Agenda:

Finalize Portfolios

Organize Contents:

  • these items must be neatly arranged in this order

  1. Rough sketches (any format, neatly stapled together as a group)

  2. Final Sketches (on graph paper, drawn with ruler, well labeled with details and pros/cons)

  3. Design Selection Grid (fulled out filly and final choice identified.

  4. Calculations of Materials Requirements

    • Use FDSS format to calculate the circumference and area of any insulation materials required

  5. Cost Estimate (use the table provided to calculate the cost of the materials you expect to use.)

  6. Calculation of Volume/Measurement Check

Some may not be done/available - that is OK!

Following this, you may work on your project but there is no access to the supply room.

Identify and List the Materials Needed

Calculate the Mass of Them

Calculate the Price of the materials you need.

YETI Green™ Logo Information

.

Monday, February 12, 2024. Day 1

Homeroom

Classwork Due:

  • Spanish: Spanish Placement Test Today!

    • Review Graphic Organizer

  • Science: Complete YETI Green Drawings if not done

  • ELA:

  • Civics:

  • SciTech:

Do Now:

Take out your chrome book.

go to Google Classroom

Homework:

None

Today’s Agenda:

Create Portfolios

  • Take one Manilla Folder per team

  • Please label it in black or blue pen.

    • Left Side Top Tab: Team Name

    • Right side top Tab: Class Period

    • Front cover, left side: Team Member Names

Organize Contents:

  • these items must be neatly arranged in this order

  1. Rough sketches (any format, neatly stapled together as a group)

  2. Final Sketches (on graph paper, drawn with ruler, well labeled with details and pros/cons)

  3. Design Selection Grid (fulled out filly and final choice identified.

  4. Calculations of Materials Requirements

    • Use FDSS format to calculate the circumference and area of any insulation materials required

  5. Cost Estimate (use the table provided to calculate the cost of the materials you expect to use.)

  6. Calculation of Volume/Measurement Check

Some may not be done/available - that is OK!

Following this, you may work on your project but there is no access to the supply room.

Identify and List the Materials Needed

Calculate the Mass of Them

.